News Flash

News flash

Posted on: May 11, 2021

SH146 Expansion Project: Clear Creek Full Channel Closure

UPDATE HIGHWAY 146 EXPANSION PROJECT (1)

South (outbound) closure

When: Monday, May 10, 2021 through Saturday, May 15, 2021

Please be advised that when one channel is closed, the other channel will have two-way vessel traffic. The two-way traffic will be managed as follows:
  • Traffic will be directed by a green and red signal on each side of the channel, indicating allowed direction of travel in the channel based on time.  The time interval is 5 minutes per direction.  This is based on feedback from the boating community and the U. S. Coast Guard.
  • Flagging vessels plan to use radio channel 16 to communicate with approaching vessels.  Please pay attention to the radio and to message boards near the channel for any updates.
  • Flaggers on boats will direct traffic during daylight hours on Saturday and Sunday, or as directed by the U.S. Coast Guard.
  • To assist boaters in navigating through the correct channel, chains of red/orange round buoys will be placed delineating the edge of the travel to the open channel, and prevent boaters from entering the closed channel.
  • At various times law enforcement assets will be on-scene to included Galveston County Sheriff’s Marine Division and U.S. Coast Guard to ensure adherence to this marine traffic management plan.
  • Message boards will be placed on both approaches to the channel to assist with notifying approaching vessels.

Full channel closures (cancelled until further notice)

  • The full closure means that the channel will be fully closed to all vessel traffic (except emergency vessels) for the duration of that closure.  This is necessary because concrete bridge girders will be lifted and set on the bridge, and vessels can not pass under this operation for safety reasons.

Facebook Twitter Email

Other News in News flash

Screen Shot 2021-06-08 at 3.07.01 PM

Waterfront Properties for Lease

Posted on: June 8, 2021
1

Alligator Sighting FAQs

Posted on: June 8, 2021

WATERFRONT TRANSFER

Posted on: October 1, 2020
Screen Shot 2021-02-26 at 9.45.26 AM

COVID-19 UPDATE: February 26, 2021

Posted on: February 26, 2021
Screen Shot 2020-11-18 at 10.41.23 AM

Newly Elected Council Members Sworn In

Posted on: November 18, 2020
CLOSURES

CLS closures and cancellations

Posted on: March 20, 2020
Sunflower Photo Spring Promotional Instagram Post

2019-2024 Strategic Plan is now online!

Posted on: February 26, 2020
WE WANT YOU

Volunteers Needed

Posted on: November 13, 2019